Production planning software case study · bottling plantLine planning with AI.
- Industry
- Manufacturing · beverages
- Process
- Production planning
- Timeline
- Under a month
- Product
- TailoredPlan
On the shop floor in under a month.
The planner approves suggestions from the production planning software instead of rebuilding spreadsheets every time an order changes.

from project start to a system the bottling plant uses to plan work on its lines.
Planning by spreadsheet.
Every order change meant replanning bottling lines, changeovers and maintenance windows manually, in several spreadsheets at once.
From order to line in one system.
- /01The plan becomes tasks
- /02AI suggests what goes where
- /03Changeovers and capacity
- /04Live production dashboard
Before · manual handovers
- Orders
- Planning spreadsheets
- Changeovers · maintenance
- Lines
After · one connection
- Orders
- TailoredPlan
- Lines
03 — Production dashboard
- Line 1
- Water 0.5 l · task 4462Mon–Tue
- Water 1.5 l · task 4468Wed–Thu
- Line 2
- Soft drink 0.33 lMon
- ▲ Warning · changeover clashes with maintenanceTue–Wed
- Maintenance windowThu
- Line 3
- Sparkling water 1 l · task 4459Mon–Wed
- AI suggestion: task 4471Thu
- Line 1: Water 0.5 l · task 4462 (Mon–Tue); Water 1.5 l · task 4468 (Wed–Thu)
- Line 2: Soft drink 0.33 l (Mon); ▲ Warning · changeover clashes with maintenance (Tue–Wed); Maintenance window (Thu)
- Line 3: Sparkling water 1 l · task 4459 (Mon–Wed); AI suggestion: task 4471 (Thu)
Dashboard illustration with sample data
Manual replanning across several spreadsheets.
The planner approves instead of rebuilding.
from project start to a system on the shop floor
planner dashboard instead of several spreadsheets
Questions about production planning.

Do we have to replace our spreadsheets?
Not at the start. We begin with your existing plan and data. Plan items become tasks for each line, and your planner approves suggestions instead of re-entering the spreadsheet.
What does the system take into account?
Lines, changeovers, maintenance windows and capacity. It suggests which job goes on which line, and the production dashboard shows the current status of each line.
Who makes the decision?
The planner. AI proposes job assignments, and a person approves or rejects them.
How long did the implementation take?
In this project, under a month: from initial development to live production scheduling on the shop floor.
NewsletterOne project like this, explained in detail once a month. One email, a 4-minute read.
By subscribing, you accept the terms of service and agree to receive the TailoredByte newsletter at this address, including information about our services. You can withdraw your consent at any time with the link in every email. Learn more in our privacy policy.
When spreadsheets are no longer enough.
30 minutes online. Tell us about your process and we’ll tell you where to start.
30 minutes · online · in Polish or English